Emerson Bristol ControlWave LP Guide d'installation

Naviguer en ligne ou télécharger Guide d'installation pour Mise en réseau Emerson Bristol ControlWave LP. Emerson Bristol ControlWave LP Setup guide Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 33
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Bri
sto
l B
abcock
ControlWave
I/O Expansion Rack
Quick Setup Guide
D5122 – December, 2005
Vue de la page 0
1 2 3 4 5 6 ... 32 33

Résumé du contenu

Page 1 - Quick Setup Guide

Bristol Babcock ControlWave I/O Expansion Rack Quick Setup Guide D5122 – December, 2005

Page 2

Setting up the Hardware 10Plug RS-232null modemcable into COM2 • Switch bank SW1: all switches in the ON position, unless this I/O rack is part of

Page 3

Setting up the Hardware 11Eth erne tPort 6. Install a ground wire between the Chassis Ground Lug and a known good Earth Ground (see Section 2.3.1

Page 4 - If You Need Help…

Setting Configuration Parameters 12Choose the communication port on (NOT on the Expanded I/O Rack)the PCworkstationSpecify the baud rate for that p

Page 5 - Table of Contents

Setting Configuration Parameters 13Turn off auto local address detectionUse "1" as the local addressChoose 'CWave_RIO'Finally,

Page 6 - Introduction

Setting Configuration Parameters 14Signing On in the Flash Configuration Utility Enter the username and password and click on [OK]. Once you hav

Page 7 - Introduction

Setting Configuration Parameters 15Defining an Ethernet Port When you have successfully signed on, click on the "Ports" tab. On the &ap

Page 8

Setting Configuration Parameters 16Defining IP Parameters Click on the 'IP Parameters' tab, and specify the IP address of the host Contro

Page 9

Setting Configuration Parameters 17Setting Application Parameters Click on the 'Application Parameters' tab. Timeouts Power Fail T

Page 10 - Setting up the Hardware

Setting Configuration Parameters 18If the amount of time the power was off is greater than the specified Power Fail Timeout, DOs will be set to 0 (F

Page 11 - Setting up the Hardware

Setting Configuration Parameters 19Redundancy Transfer Unit A Addr This must be an IP address corresponding to an Ethernet port on the ‘A’ I/O E

Page 12

2The information in this document is subject to change without notice. Every effort has been made to supply complete and accurate information. Howev

Page 13

Setting Configuration Parameters 20Saving Your Configuration Parameter Changes to the I/O Rack To save your configuration changes, click on the [Sa

Page 14

Setting up the Host to Reference the I/O Rack 21Setting up the Host to Refer ence the I/O Rack Configuring the I/O Boards in ControlWave Designer

Page 15

Setting up the Host to Reference the I/O Rack 22Select List of Boards: NOTE: The I/O Configuration Wizard starts with page 2 by default; you do NOT

Page 16 - the Network Host PCnot

Setting up the Host to Reference the I/O Rack 23 In the "Ext Rack Boards" section, is a list of boards which can reside in the I/O Expan

Page 17

Setting up the Host to Reference the I/O Rack 24 The "Board Name" and "Map Type" may be left at their defaults. "Slot Numb

Page 18

Setting up the Host to Reference the I/O Rack 25Analog Boards (ER_AI16, ER_AO8) Some fields only appear in the Analog Output (AO) board and are n

Page 19

Setting up the Host to Reference the I/O Rack 26Pin Name Defines a name identifying this pin. IMPORTANT: This name is used as a variable name in you

Page 20

Setting up the Host to Reference the I/O Rack 27 User Configured Output When checked, allows the user to enter a value for this pin which will be

Page 21

Setting up the Host to Reference the I/O Rack 28Digital Output Board Page List of Available Pins Displays a list of the individual pins (I/O points

Page 22

Setting up the Host to Reference the I/O Rack 29 List of Available Channels Displays a list of the individual channels (counter I/O points) on thi

Page 23

IMPORTANT! READ INSTRUCTIONS BEFORE STARTING! Be sure that these instructions are carefully read and understood before any operation is attempted. I

Page 24

Setting up the Host to Reference the I/O Rack 30 These variables are: Variable Description ERSTAT_x_BOARDSTATUS Board status code. Always present.

Page 25

READER RESPONSE FORM Please help us make our documentation more useful to you! If you have a complaint, a suggestion, or a correction regarding thi

Page 26

U.S.A. Locations: Northern Region Bristol Babcock Inc. 1100 Buckingham Street Watertown, CT 06795 Phone: +1 (860) 945-2381 Fax: +1 (

Page 27

Return to the Table of ContentsReturn to the List of Manuals

Page 28 - High Speed Counter Page

4 Before You Begin This guide is intended to help you get 'up-and-running' with a minimal amount of effort. It does NOT, however, tell yo

Page 29

Table of Contents 5 Introduction...

Page 30

Introduction 6Introduction The I/O capacity of the ControlWave Process Automation Controller can be increased by the addition of one or more Contro

Page 31

Introduction 7The configuration process for the I/O Expansion Rack is divided up into 3 parts. Setting up the Hardware This section gives you a qu

Page 32

Setting up the Hardware 8Setting Up the Hardware This involves unpacking the ControlWave I/O Expansion Rack hardware, mounting the chassis, installi

Page 33 - Return to the List of Manuals

Setting up the Hardware 9 3. Remove the CPU Module from its carton and install it into Chassis slot 2, i.e., the second slot from the left end of

Commentaires sur ces manuels

Pas de commentaire