ControlWave Gas Flow Computer (GFC Plus) Instruction Manual (CI-ControlWave GFC Plus)
2-4 Installation Revised Feb-2013
2.2 Installation Overview
Installing a ControlWave GFC Plus involves several general steps:
1. Unpacking, assembling, and configuring the hardware. This
includes:
a) Mounting the enclosure on site. (See Section 2.2.2)
b) Removing the CPU/System Controller board and optional
Process I/O board assembly so you can enable the backup
battery by setting jumper W3 on the CPU/System Controller
board to position 1 to 2. See Section 5.2.2 for instructions on
removing/replacing the board assembly, see Section 2.3.2 for
information on setting jumpers.
b) Setting other switches and jumpers on the CPU/System
Controller board (see Section 2.3.1 and Section 2.3.2) and on the
Process I/O board (see Section 3.2.1 and Section 3.2.2) and
placing both boards (as a single assembly) back into the chassis.
d) Connecting communication cables. (See Sections 2.9.2, and
2.9.3)
e) Wiring I/O. (See Section 3.3)
f) Connecting an external 3808 transmitter (see Section 3.3.8 if
required).
f) Installing a ground wire between the enclosure’s ground lug and
a known good Earth ground. (See Section 2.2.3)
g) Installing the solar panel (See Section 2.4) and rechargeable
battery (See Section 2.5 if applicable)
h) Connecting the RTD probe (if required). (See Section 3.3.7)
i) Wiring power to the unit. (See Section 2.3.4)
j) Turning on power. (See Section 4.1)
2. Installing PC-based software (TechView).
3. Establishing communications to perform calibration activities or
view data using the standard flow measurement application menus.
Note: Steps 2 through 3 require that you install and use OpenBSI
TechView software to perform calibration and that you use the
standard menus. This manual focuses on hardware installation
and preparation. Software installation and configuration is
beyond the scope of this manual. Refer to the TechView User’s
Guide (D5131) and the ControlWave Flow Measurement
Applications Guide (D5137) for more information. If you are
not using the flow measurement application and plan to create
your own application, refer to the Getting Started with
Vue de la page 21