631-205-105
Version C, August 2009
Outside Plant Equipment Proprietary Information Page 9 of 23
ALERT
TO AVOID EQUIPMENT DAMAGE:
* DO NOT REMOVE - pallet and plastic covering from the cabinet until the cabinet is
transported to the installation site.
* Always ship and store the MESA® SOLE cabinet(s) on the pallet in an upright posi-
tion to avoid possible damage to the internal equipment.
* Until the cabinet is turned up for service, the desiccant shipped with the cabinet
must remain in the cabinet to retard moisture condensation.
* DO NOT REMOVE - battery drawer covers until the cabinet is bolted securely to the
pad.
* DO NOT INSTALL OR STORE - batteries in cabinet(s) prior to cabinet installation.
* If the external packaging appears excessively damaged, do not accept the unit from
the shipper as interior damage may not be apparent.
* CAREFULLY remove all packaging material from around the cabinet and pallet.
Dispose of the packaging according to local practices. DO NOT REMOVE THE CABI-
NET FROM ITS PALLET AT THIS TIME.
Note: When ordered, batteries are shipped on separate pallets from the
cabinet.
4.2.2 Inspect any moving parts, mounting hardware, connectors, and electronic
equipment. If there is any damage, notify your supervisor for further instructions.
4.2.3 Check the packing slip to make sure all components ordered were received. If there
are missing components, notify your supervisor for further instructions.
4.2.4 Carefully remove all packaging material from around the pallet. Dispose of
packaging according to local practices. DO NOT REMOVE THE CABINET FROM
ITS PALLET AT THIS TIME.
4.3 Preparing the Cabinet
Step 1: If not done already, open the front door of the equipment chamber.
Step 2: Remove the mounting bolts from the front equipment base cover and
remove the cover. Set the cover safely aside for later replacement.
Step 3: A gasket is installed on the concrete pad to prevent corrosion between
the concrete pad and the cabinet mounting surfaces (Fig. 6).
Step 4: Clean all debris from the concrete pad.
Step 5: Remove the rectangular rubber gasket from the splice chamber.