Page 1 - With VPMP

AC PowerFor Business-Critical Continuity™Liebert® FPC™ With VPMPUser Manual - 15 kVA -300kVA, 3 Phase, 50 & 60 Hz

Page 2 -

Installation Instructions6Figure 3 Recommended minimum service and ventilation clearancesNOTE1. Service access is required at the front and rear. 2. S

Page 3 - TABLE OF CONTENTS

Installation Instructions71.1.5 Floor Pedestal InstallationFloor pedestals are optional equipment that provide clearance for bottom cable entry or exi

Page 4

Installation Instructions81.2 Additional Distribution Mounting and WiringFor Liebert® FPC™s with more than four panelboards, the additional panelboard

Page 5

Installation Instructions91.3 Power and Control WiringPower and control wiring should be installed by licensed electricians. All power and control wir

Page 6 - 1.0 INSTALLATION INSTRUCTIONS

Installation Instructions10Figure 5 Electrical connection location for 23" (584mm) cabinetFigure 6 Electrical connection location for 47" (1

Page 7 - Cabinet Dimensional Data

Installation Instructions11Figure 7 Electrical connection location for 47" cabinet with Square D I-Line panelboard Front ViewWithout Doorsand Acc

Page 8 - 47" (1194mm)

Installation Instructions12Table 4 Suggested minimum input wire size datakVAInputVoltageUnits with Transformers Transformerless UnitsInputFLAInputOPDS

Page 9 - 1.1.4 Location Considerations

Installation Instructions13150208 427 600 (2) 350 kcmil * 416 600 (2) 350 kcmil *240 370 500 (2) 250 kcmil * - - -380 234 300 350 kcmil 228 300 350 kc

Page 10

Installation Instructions141.3.2 Junction Box InstallationMain input (power) and low-voltage (control) junction boxes are available for the Liebert® F

Page 11 - Installation Instructions

Installation Instructions15Figure 8 Low-voltage control junction box connections, typicalFigure 9 Main input junction box connections, typical1.3.3 Sy

Page 13 - 1.3 Power and Control Wiring

Installation Instructions16Equipment GroundingEquipment grounding is primarily for safety. Correct implementation of grounding also enhances equipment

Page 14 - FPC15206

Installation Instructions17Recommended methods for running the grounding electrode conductor (arranged by preference for system performance; as accept

Page 15 - FPC15202

Installation Instructions181.3.5 Output Power ConnectionsOutput circuit breaker(s) and/or panelboards with ground and neutral provisions are provided

Page 16

Installation Instructions19Figure 11 Typical Liebert® FPC™ equipment arrangementLiebert FPCRemote Emergency Power Off Switch (REPO)Ground electrode c

Page 17

Installation Instructions201.3.6 Control Wiring ConnectionsLiebert® power conditioning systems have provisions for external shutdown control from Remo

Page 18

Installation Instructions21Figure 13 Typical low-voltage junction box (if used) control wiring for units without monitoring212019181716151413121110987

Page 19 - 1.3.3 System Grounding

Installation Instructions22Figure 14 Typical low-voltage junction box (if used) control wiring for units with monitoring212019181716151413121110987654

Page 20 - Signal Reference Grid

Installation Instructions23Figure 15 Control wiring for units without low-voltage control boxBuilding Interface RelayRemove jumperwhen 5th customerala

Page 21 - Typical Liebert FPC

Installation Instructions241.3.7 Adapter BoardThe Adapter Board (AB) provides customer interface to the Liebert® FPC™ monitoring systems for units wit

Page 22 - WARNING

Equipment Inspection and Startup252.0 EQUIPMENT INSPECTION AND STARTUP2.1 Internal InspectionA detailed internal inspection should be performed after

Page 23 - Liebert FPC

iTABLE OF CONTENTS1.0 INSTALLATION INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21.1 Unpa

Page 24

Equipment Inspection and Startup26Table 11 Torque specifications, generalElectrical connectionswith 1 Belleville washerElectrical connectionswith 2 Be

Page 25 - Terminal Strip

Inspection and Startup Checklist273.0 INSPECTION AND STARTUP CHECKLIST3.1 Inspection ___ 1. Confirm that the exterior of unit is undamaged (including

Page 26 - FPC15550

Inspection and Startup Checklist28___ 4. Check and record the input voltages at the junction box:Volts, Phase A to Phase B = ______________Volts, Phas

Page 27 - LDM13009

Inspection and Startup Checklist293.3 Monitoring System Checklist Basic Indicators___ 1. Turn On the building power to the unit, then turn the main in

Page 28 - 1.3.7 Adapter Board

Inspection and Startup Checklist303.4 Equipment Connection Check-Out of Units With Distribution Cables___ 1. Turn on main input power to the unit, the

Page 29

Operating Instructions314.0 OPERATING INSTRUCTIONS4.1 Startup Procedures Before the unit is placed into service after initial installation, after equi

Page 30

Operating Instructions324.2 Basic Monitor PanelBasic Monitoring provides transformer overtemperature alarm, transformer overtemperature shutdown and E

Page 31 - 3.2 Startup

Operating Instructions334.3 Power Monitor PanelLiebert Power Monitor Panel with Velocity protocol (VPMP) provides input voltage, output current and vo

Page 32

Operating Instructions34The VPMP detects and annunciates by alarm message the following conditions:• Output Overvoltage• Output Undervoltage• Output O

Page 33

Operating Instructions354.4 Liebert Current Plus Monitoring (If Supplied)Liebert Current Plus Monitoring (Liebert CPM) provides the current and voltag

Page 34

iiFIGURESFigure 1 Typical cabinet and floor planning dimension data, 23" (584mm) cabinet, 15-125 kVA . . . . . . . . 3Figure 2 Typical cabinet

Page 35 - 4.0 OPERATING INSTRUCTIONS

Operating Instructions36The following metering parameters may be displayed:• Voltage - Line-to-Line• Voltage - Line-to-Neutral• Neutral Current• Groun

Page 36 - 4.2 Basic Monitor Panel

Operating Instructions374.5 Liebert Distribution Monitoring (If Supplied)The Liebert Distribution Monitoring (Liebert LDMF) provides the current and v

Page 37 - 4.3 Power Monitor Panel

Operating Instructions38The following metering parameters may be displayed:• Voltage - Line-to-Line• Voltage - Line-to-Neutral• Neutral Current• Groun

Page 38 - Operating Instructions

Maintenance395.0 MAINTENANCE5.1 RepairEven the most reliable equipment may fail. Liebert Services is at your service to assure fast repair of your uni

Page 39

Ensuring The High AvailabilityOf Mission-Critical Data And Applications.Emerson Network Power, a business of Emerson (NYSE:EMR),is the global leader i

Page 40

1IMPORTANT SAFETY INSTRUCTIONSELECTROMAGNETIC COMPATIBILITY—The Liebert FPC complies with the limits for a Class A digital device, pursuant to Part 15

Page 41

Installation Instructions21.0 INSTALLATION INSTRUCTIONS1.1 Unpacking and Installation1.1.1 Unpacking and Preliminary InspectionA quality installation

Page 42

Installation Instructions3Figure 1 Typical cabinet and floor planning dimension data, 23" (584mm) cabinet, 15-125 kVATable 1 23-inch cabinet weig

Page 43 - 5.0 MAINTENANCE

Installation Instructions4Figure 2 Typical cabinet and floor planning dimension data, 47" (1194mm) cabinet 50-300kVATable 2 47-inch cabinet weigh

Page 44 - SL-20417_REV2_08-12

Installation Instructions51.1.3 Unit PreparationThe Liebert® FPC™ may be easily removed from the shipping pallet and installed by customer personnel.