EZH and EZHSO Series
10
Note
Separate sensing lines must be used for
the “S” and the “A” ports.
CAUTION
To prevent damage to the pilot during
Startup, the sense and bleed lines
should be located on the same side of
the downstream block valve.
7. Install hand valves in the downstream sense and
bleed lines if desired. If hand valves are installed,
they should be full ow valves, such as a full port
ball valve. For EZHSO Series installation, a vent
valve downstream of the regulator is needed. It
should be installed directly in the PRX Series pilot
bleed line connection (line from Port S to pipe).
A full bore NPS 1/4 ball valve for the vent line is
preferred to provide sufcient ow.
8. For optional remote pneumatic loading of a
PRX Series pilot, make the spring case piping
connections just as they would be made for
remote venting in step 4.
Wide-Open Monitor Regulator
1. Follow the procedures in the All Installations section
and then continue with step 2 of this section. The
sense and bleed control lines of both the upstream
and downstream pilots will be connected to the
downstream piping (see Figure 5).
2. Connect the pilot supply line for the downstream
regulator to the outlet “R” port of the Type SA/2
pilot supply lter regulator.
Working Monitor Regulator
1. Follow the procedure in the All Installations
section and then continue with step 2 of this
section. The sense line of the upstream monitor
pilot (from Port A on the Type PRX/125) and
the bleed (Port S) and sense lines (Port A) of
the downstream pilot will be connected to the
downstream piping (see Figure 6).
2. Connect an inlet supply line from the upstream
piping to the inlet “M” port of the downstream
Type SA/2 pilot supply lter regulator.
3. Connect a control (sense) line from the “A” port
of the upstream working Type PRX/120 pilot to
the intermediate pressure portion of piping, using
3/8 in. / 9.5 mm or larger outside diameter tubing.
4. Connect a downstream bleed line from the “S” port
of the upstream working Type PRX/120 pilot to
the intermediate pressure portion of piping, using
3/8 in. / 9.5 mm or larger outside diameter tubing.
Startup and Adjustment
Pre-startup Considerations
Each regulator is factory-set for the outlet pressure
specied on the order. If no setting was specied,
outlet pressure was factory-set at the mid-range of
the pilot control spring. Before beginning the start-up
procedure in this section, make sure the following
conditions are in effect:
Block valves isolate the regulator
Vent valves are closed
A bypass, if any, is in operation
In all cases, check the pilot control spring setting to
make sure it is correct for the application.
CAUTION
Be sure to slowly introduce pressure
into the system to prevent downstream
overpressure due to potential rapid
pressure increase. Pressure gauges
should always be used to monitor
downstream pressure during Startup.
Procedures used in putting this
regulator into operation must be planned
accordingly if the downstream system is
pressurized by another regulator or by a
manual bypass.
Note
When using a Type SA/2 pilot supply
lter regulator, the differential pressure
across the main regulator must be at
least 45 psid / 3.1 bar d for optimum
regulator performance. The Type SA/2
can be removed if differential pressure
across the main regulator is less than
45 psid / 3.1 bar d and inlet pressure
stays at or below 200 psig / 13.8 bar.