Integrated Cabinet SolutionsFor Business-Critical Continuity™DCF™ Optimized Rack SystemUser Manual
Installation63.3 Unloading the DCF Optimized Rack SystemBefore unloading a DCF Optimized Rack System, note the weight of the model (see 5.0 - Specific
Installation73.4.1 Installing the Edge Guard1. Press edge guard to top cover cut outs by pressing along the edge of the cut out opening.2. Trim excess
Installation8Figure 6 19" EIA rail repositioningPosition 19" EIA Rails on 800mm Cabinets1. Determine the proper location of the 19" EIA
Installation93.4.3 Door—Remove and ReverseDCF doors are removable for convenience when installing or maintaining equipment. The DCF front door is also
Installation10Figure 9 Alternate door hinge position and grounding wire location3.4.4 Side PanelsThe DCF uses dual split side panels fashioned from sh
Installation113.5 Power Distribution Unit MountingPower distribution units may be mounted multiple ways in the DCF Optimized Rack System rack. They ma
Installation123.7 Baying ConfigurationTwo or more DCF cabinets of the same height can be bayed with the supplied baying brackets. The brackets have th
Periodic Maintenance134.0 PERIODIC MAINTENANCEYour DCF Optimized Rack System cabinet requires no special maintenance. It should be cleaned periodicall
Specifications145.0 SPECIFICATIONSFigure 13 DCF Optimized Rack System model numbersTable 5 DCF pre-configured optimized rack systemsPart # Description
IMPORTANT SAFETY GUIDELINESSAVE THESE INSTRUCTIONSThis manual contains important instructions that should be closely followed during install
Ensuring The High AvailabilityOf Mission-Critical Data And Applications.Emerson Network Power, a business of Emerson (NYSE:EMR),is the global leader i
iTABLE OF CONTENTSIMPORTANT SAFETY GUIDELINES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21.0
iiFIGURESFigure 1 Caster plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Introduction11.0 INTRODUCTIONThe highly versatile DCF Optimized Rack System provides an organized, secure, controlled environment in a single system f
Major Components22.0 MAJOR COMPONENTSDCF Optimized Rack System will have all of the components addressed in this section. All components are finished
Major Components32.2.2 Side PanelsSide panels for the DCF Optimized Rack System are a split side panel design constructed of sheet metal. Each side pa
Major Components42.2.3 Top CoverAll DCF racks ship with top cover constructed of sheet metal. The top cover has cutouts for fan mounting, cabling, and
Installation53.0 INSTALLATION3.1 InspectionUpon receiving a DCF Optimized Rack System, examine the packaging for any signs of mishandling or damage. I
Commentaires sur ces manuels