Emerson ControlWave GFC Manuel d'instructions Page 73

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 106
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 72
ControlWave Gas Flow Computer (GFC) Instruction Manual (CI-ControlWave GFC)
Revised Nov-2011 Operation 4-1
Chapter 4 – Operation
This chapter provides general operational details for using the
ControlWave GFC.
In This Chapter
4.1 Powering Up/Powering Down the ControlWave GFC ..................... 4-1
4.2 Communicating with the ControlWave GFC .................................... 4-2
4.2.1 Default Comm Port Settings ................................................. 4-2
4.2.2 Collecting Data from the ControlWave GFC ........................ 4-3
4.3 Creating and Downloading an Application (ControlWave Project) .. 4-3
4.4 Creating and Maintaining Backups .................................................. 4-3
4.4.1 Creating a Zipped Project File (*.ZWT) For Backup ............ 4-4
4.4.2 Saving Flash Configuration Parameters (*.FCP) ................. 4-5
4.4.3 Backing up Data ................................................................... 4-6
WARNING
EXPLOSION HAZARD
Substitution of components may impair suitability for use in Class I,
Division 2 environments.
When the ControlWave GFC is situated in a hazardous location, turn off
power before servicing or replacing the unit and before installing or
removing I/O wiring.
Do not disconnect equipment unless the power is switched off or the
area is known to be non-hazardous.
See Appendix A for details on Class I Division 2 usage of this device.
4.1 Powering Up/Powering Down the ControlWave GFC
The ControlWave GFC receives power either from a solar panel and
user-supplied battery or from an external bulk power supply attached
using connector TB1 on the CPU/System Controller board. It can also
receive power through alternate connector TB2 on the same board.
Chapter 2 includes instructions for wiring power to the ControlWave
GFC. See Figure 2-3 for the location of these connectors.
Power Up
To apply power to the ControlWave GFC, plug in connectors TB1 and
optionally TB2 on the CPU/System Controller board. If your
ControlWave project resides in flash memory, the project will load into
SRAM and begin execution. Depending upon the setting of the SRAM
control switch, retain variable values may load as well.
Vue de la page 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 105 106

Commentaires sur ces manuels

Pas de commentaire